The desk's own record of what it quoted, what changed on trades and what freight cost. Weeks run Monday to Sunday, Sydney time. Showing financial year to date: Wed 1 Jul to Sun 11 Oct.
Quotes sent, won and lost
By week
Each quote sent to one buyer counts once as sent: a quote that went to three buyers is three sent. Won means the buyer accepted or an order was taken in their name. Lost means they declined and no order was taken. A buyer who declined and then ordered is counted on its own, as declined, then ordered, and is neither won nor lost. A counter is neither won nor lost, so it stays under countered until it is decided. A quote is counted in the week it was sent, whenever the answer came; a send whose date is not held is counted on its own line, in no week. It does not show quotes the desk has no record of sending.
2 orders were taken in this period from a quote with no record of it being sent to that buyer. They are not counted above.
| Week starting | Sent (quotes) | Won (quotes) | Lost (quotes) | Declined, then ordered (quotes) | Countered (quotes) | Open (quotes) | Won, per cent of quotes sent |
|---|---|---|---|---|---|---|---|
| Mon 29 Jun | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 6 Jul | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 13 Jul | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 20 Jul | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 27 Jul | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 3 Aug | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 10 Aug | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 17 Aug | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 24 Aug | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 31 Aug | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 7 Sep | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 14 Sep | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 21 Sep | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 28 Sep | 0 | 0 | 0 | 0 | 0 | 0 | not held |
| Mon 5 Oct | 3 | 0 | 0 | 0 | 0 | 3 | 0.00% |
| All weeks | 3 | 0 | 0 | 0 | 0 | 3 | 0.00% |
By customer
Each quote sent to one buyer counts once as sent: a quote that went to three buyers is three sent. Won means the buyer accepted or an order was taken in their name. Lost means they declined and no order was taken. A buyer who declined and then ordered is counted on its own, as declined, then ordered, and is neither won nor lost. A counter is neither won nor lost, so it stays under countered until it is decided. A quote is counted in the week it was sent, whenever the answer came; a send whose date is not held is counted on its own line, in no week. It does not show quotes the desk has no record of sending. The customer is the company the quote went to, by its registered name.
| Customer | Sent (quotes) | Won (quotes) | Lost (quotes) | Declined, then ordered (quotes) | Countered (quotes) | Open (quotes) | Won, per cent of quotes sent |
|---|---|---|---|---|---|---|---|
| Eastern Green Marketing Pte. Ltd. | 1 | 0 | 0 | 0 | 0 | 1 | 0.00% |
| EASTERN GREEN MARKETING PTE. LTD. / VISION INTERNATIONAL | 1 | 0 | 0 | 0 | 0 | 1 | 0.00% |
| Zaynco | 1 | 0 | 0 | 0 | 0 | 1 | 0.00% |
By market
Each quote sent to one buyer counts once as sent: a quote that went to three buyers is three sent. Won means the buyer accepted or an order was taken in their name. Lost means they declined and no order was taken. A buyer who declined and then ordered is counted on its own, as declined, then ordered, and is neither won nor lost. A counter is neither won nor lost, so it stays under countered until it is decided. A quote is counted in the week it was sent, whenever the answer came; a send whose date is not held is counted on its own line, in no week. It does not show quotes the desk has no record of sending. The market is the destination the quote was priced for.
| Market | Sent (quotes) | Won (quotes) | Lost (quotes) | Declined, then ordered (quotes) | Countered (quotes) | Open (quotes) | Won, per cent of quotes sent |
|---|---|---|---|---|---|---|---|
| SIN | 2 | 0 | 0 | 0 | 0 | 2 | 0.00% |
| SG (SIN) | 1 | 0 | 0 | 0 | 0 | 1 | 0.00% |
By product
Each quote sent to one buyer counts once as sent: a quote that went to three buyers is three sent. Won means the buyer accepted or an order was taken in their name. Lost means they declined and no order was taken. A buyer who declined and then ordered is counted on its own, as declined, then ordered, and is neither won nor lost. A counter is neither won nor lost, so it stays under countered until it is decided. A quote is counted in the week it was sent, whenever the answer came; a send whose date is not held is counted on its own line, in no week. It does not show quotes the desk has no record of sending. A quote of two products counts once under each, so the rows here add up to more than the quotes sent.
| Product | Sent (quotes) | Won (quotes) | Lost (quotes) | Declined, then ordered (quotes) | Countered (quotes) | Open (quotes) | Won, per cent of quotes sent |
|---|---|---|---|---|---|---|---|
| Strawberries | 2 | 0 | 0 | 0 | 0 | 2 | 0.00% |
| Strawberry | 1 | 0 | 0 | 0 | 0 | 1 | 0.00% |
Why quotes were lost
A reason is shown only where the record holds it as the buyer's: a message from the buyer, their counter, or the reason a trader chose when he retired the quote. A line written by the desk or a model is never shown as the buyer's words. "No reason recorded" means the record holds none, and the desk does not guess one.
No quote was lost in this period.
Counters
Each row is a buyer who countered. Our price is shown only where exactly one line of the quote matches the counter in currency and unit; otherwise it is not held, and so is the difference. The difference is their counter less our price, so a negative figure is the buyer asking for less.
No buyer countered in this period.
Margin won against margin lost
All markets and products
Each quote line is counted once. A line is won when an order names it, at the quantity ordered, or when a buyer accepted the quote, at the quantity offered; it is lost when every buyer declined it. 3 quote lines are still undecided and left out. Margin over total cost is gross profit divided by total cost; margin on revenue is gross profit divided by the sell. Where an order took a different quantity from the one costed, the cost is scaled in proportion to the quantity, so fixed charges are approximate. A line whose cost is not whole is counted but shows no money, because a profit over part of a cost is not a margin. This is the forecast cost struck for the quote, not what the trade later cost.
No quote line sent in this period has been won or lost yet.
By market
Each quote line is counted once. A line is won when an order names it, at the quantity ordered, or when a buyer accepted the quote, at the quantity offered; it is lost when every buyer declined it. 3 quote lines are still undecided and left out. Margin over total cost is gross profit divided by total cost; margin on revenue is gross profit divided by the sell. Where an order took a different quantity from the one costed, the cost is scaled in proportion to the quantity, so fixed charges are approximate. A line whose cost is not whole is counted but shows no money, because a profit over part of a cost is not a margin. This is the forecast cost struck for the quote, not what the trade later cost.
No quote line sent in this period has been won or lost yet.
By product
Each quote line is counted once. A line is won when an order names it, at the quantity ordered, or when a buyer accepted the quote, at the quantity offered; it is lost when every buyer declined it. 3 quote lines are still undecided and left out. Margin over total cost is gross profit divided by total cost; margin on revenue is gross profit divided by the sell. Where an order took a different quantity from the one costed, the cost is scaled in proportion to the quantity, so fixed charges are approximate. A line whose cost is not whole is counted but shows no money, because a profit over part of a cost is not a margin. This is the forecast cost struck for the quote, not what the trade later cost.
No quote line sent in this period has been won or lost yet.
Prices by week
What growers asked, by week
Supply prices are held by grower and product, not by market: a grower's offer does not say where the fruit will be sold, so this table cannot be split by market, and the sell prices below are the ones that are. Each row is one grower's standing offer for one week, as the price book holds it. A week is never overwritten, so last week's row stays as it was. Revisions counts the earlier offers the grower changed inside the same week. Last week shows only where the same grower, product, pack, variety and grade had an offer the week before in the same currency, unit and delivery basis. Nothing is averaged across weeks.
The price book holds no offer for any week in this period.
What we asked buyers, by week and market
From the sell prices on quote lines raised in the week, for each market and product. It is the price asked, not the price paid; an accepted price is on the order. The lowest and highest are of that week only, and nothing is averaged across weeks.
| Week starting | Market | Product | Quote lines with a sell price (lines) | Quotes (quotes) | Lowest sell | Highest sell |
|---|---|---|---|---|---|---|
| Mon 21 Sep | SIN | strawberry | 1 | 1 | AUD 51.00 per carton | AUD 51.00 per carton |
| Mon 28 Sep | AE (DXB) | Mango | 1 | 1 | AUD 99.00 per tray | AUD 99.00 per tray |
| Mon 28 Sep | Malaysia (KUL) | Strawberries | 1 | 1 | AUD 48.50 per tray | AUD 48.50 per tray |
| Mon 28 Sep | MY (KUL) | Strawberry | 2 | 1 | AUD 57.00 per tray | AUD 62.50 per tray |
| Mon 28 Sep | SG (SIN) | Strawberry | 2 | 1 | AUD 52.75 per tray | AUD 58.00 per tray |
| Mon 28 Sep | SIN | Strawberries | 1 | 1 | AUD 46.00 per tray | AUD 46.00 per tray |
| Mon 28 Sep | Singapore (SIN) | Strawberries | 1 | 1 | AUD 46.00 per tray | AUD 46.00 per tray |
| Mon 5 Oct | MY (KUL) | Avocado | 1 | 1 | AUD 52.50 per tray | AUD 52.50 per tray |
| Mon 5 Oct | MY (KUL) | Strawberry | 4 | 2 | AUD 57.00 per tray | AUD 62.50 per tray |
| Mon 5 Oct | SG (SIN) | Strawberry | 1 | 1 | AUD 53.50 per tray | AUD 53.50 per tray |
| Mon 5 Oct | SG (SIN) | Strawberry | 4 | 2 | AUD 52.75 per tray | AUD 58.00 per tray |
| Mon 5 Oct | SIN | Strawberries | 1 | 1 | AUD 46.00 per tray | AUD 46.00 per tray |
Changes on trades and what they cost
By type
The types are the risk register's. The cost of a change is the gross profit after it less the gross profit before it, so a negative figure is profit lost. Only a change where the record holds both figures in one currency is in that sum; the others are counted under changes but add no money. Claims are counted against the party on the claim's own side, with the value claimed, not the value agreed.
| Type | Register category | Changes (changes) | With gross profit held (changes) | Change in gross profit |
|---|---|---|---|---|
| Rate card superseded | Older change types | 1 | 0 | not held |
By customer
The customer is the one on the trade. The cost of a change is the gross profit after it less the gross profit before it, so a negative figure is profit lost. Only a change where the record holds both figures in one currency is in that sum; the others are counted under changes but add no money. Claims are counted against the party on the claim's own side, with the value claimed, not the value agreed.
| Customer | Changes (changes) | Change in gross profit | Claims raised (claims) | Value claimed | Claims accepted or amended (claims) |
|---|---|---|---|---|---|
| EASTERN GREEN MARKETING PTE. LTD. | 1 | not held | 4 | AUD 2,363.55 | 4 |
| AL BAKRAWE GENERAL TRADING LLC | 0 | not held | 4 | AUD 24,799.50 | 4 |
| TOTAL FRESH CONNECTION PTE LTD | 0 | not held | 3 | AUD 15,103.95 | 3 |
| B L NAIDU & SONS LTD | 0 | not held | 2 | AUD 400.15 | 2 |
| BARAKAT VEGETABLES & FRUITS COL.L.C | 0 | not held | 2 | AUD 11,826.00 | 2 |
| ENE TRADE PTY LTD | 0 | not held | 2 | AUD 5,587.20 | 1 |
| FRECO INTERNATIONAL COMPANY LIMITED | 0 | not held | 2 | AUD 19,022.06 | 2 |
| EASTERN WEALTH TRADING HONG KONG LIMITED | 0 | not held | 1 | AUD 38,340.00 | 1 |
| FRESHMART SINGAPORE PTE LTD | 0 | not held | 1 | AUD 2,712.75 | 1 |
| FRUTULIP GENERAL TRADING LLC | 0 | not held | 1 | AUD 31,430.00 | 1 |
| KIBSONS INTERNATIONAL LLC | 0 | not held | 1 | AUD 7,988.60 | 1 |
| SKY FRESH-FRUITS IMPORT & EXP. | 0 | not held | 1 | AUD 5,145.60 | 1 |
By grower
A change is put against a grower only where its trade has exactly one; a trade with several is counted under "More than one grower" and never split. The cost of a change is the gross profit after it less the gross profit before it, so a negative figure is profit lost. Only a change where the record holds both figures in one currency is in that sum; the others are counted under changes but add no money. Claims are counted against the party on the claim's own side, with the value claimed, not the value agreed.
| Grower | Changes (changes) | Change in gross profit | Claims raised (claims) | Value claimed | Claims accepted or amended (claims) |
|---|---|---|---|---|---|
| GROWER CONNECT | 1 | not held | 0 | 0 |
By forwarder
The forwarder is the one whose bill is linked to the trade; a trade with no linked bill is counted under "No forwarder bill linked". A change is put against a forwarder only where there is exactly one. The cost of a change is the gross profit after it less the gross profit before it, so a negative figure is profit lost. Only a change where the record holds both figures in one currency is in that sum; the others are counted under changes but add no money. Claims are counted against the party on the claim's own side, with the value claimed, not the value agreed.
| Forwarder | Changes (changes) | Change in gross profit | Claims raised (claims) | Value claimed | Claims accepted or amended (claims) |
|---|---|---|---|---|---|
| No forwarder bill linked to the trade | 1 | not held | 0 | 0 |
The four all-ins for each lane
Each lane, each month
Four figures, each AUD per kg gross and none put in place of another. Built is our own build from the quotes raised in the month: every cost line but the produce over the gross kilograms. Stated is what the forwarder told a principal the all-in is, from the month it was said. Sheet is the sheet in force during the month; where the card changed in the month both figures are shown with the days each applied, and where the card has several rows for the lane with different figures they are all listed, because the quote does not record which one it meant. Invoiced is a trade's forwarder bill lines in AUD over that trade's whole shipment weight, for bills issued in the month; a bill line in another currency is named and not added. "Not held" means the record has no figure, and for a sea lane no stated, sheet or invoiced figure is read yet. The last column says where each came from.
| Lane | Mode | Month | Built | Stated by the forwarder | Vision's sheet | Invoiced | Bills above the sheet (bills) | Over the sheet | Where each came from |
|---|---|---|---|---|---|---|---|---|---|
| BNE to CAL | Sea | Aug 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| BNE to CAL | Sea | Sep 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| BNE to CAL | Sea | Oct 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| BNE to DXB | Air | Jul 2026 | not held | not held | Several rows on the card: AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 3.85 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 4.15 per kg gross on PMC Emirates (EK), AUD 4.29 per kg gross on AKE Qatar (QR) | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 3.85 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 4.15 per kg gross on PMC Emirates (EK), AUD 4.29 per kg gross on AKE Qatar (QR) (Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 120: printed total AUD 15,482.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 116: printed total AUD 6,448.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 113: printed total AUD 17,438.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 121: printed total AUD 16,958.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 114: printed total AUD 6,732.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 115: printed total AUD 17,777.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 117: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 118: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 119: printed total AUD 6,217.50 over its 1,450 kg gross-weight column) Invoiced: not held | |
| BNE to DXB | Air | Aug 2026 | not held | not held | Several rows on the card: AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 3.85 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 4.15 per kg gross on PMC Emirates (EK), AUD 4.29 per kg gross on AKE Qatar (QR) to Mon 17 Aug, AUD 4.15 per kg gross on PMC Emirates (EK), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 3.55 per kg gross on PMC Qatar (QR) from Tue 18 Aug to Tue 25 Aug, AUD 4.15 per kg gross on PMC Emirates (EK), AUD 3.55 per kg gross on PMC Qatar (QR), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 3.87 per kg gross on PMC Qatar (QR) from Tue 18 Aug to Tue 25 Aug, AUD 4.15 per kg gross on PMC Emirates (EK), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 3.55 per kg gross on PMC Qatar (QR) from Wed 26 Aug | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 3.85 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 4.15 per kg gross on PMC Emirates (EK), AUD 4.29 per kg gross on AKE Qatar (QR) to Mon 17 Aug, AUD 4.15 per kg gross on PMC Emirates (EK), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 3.55 per kg gross on PMC Qatar (QR) from Tue 18 Aug to Tue 25 Aug, AUD 4.15 per kg gross on PMC Emirates (EK), AUD 3.55 per kg gross on PMC Qatar (QR), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 3.87 per kg gross on PMC Qatar (QR) from Tue 18 Aug to Tue 25 Aug, AUD 4.15 per kg gross on PMC Emirates (EK), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 3.55 per kg gross on PMC Qatar (QR) from Wed 26 Aug (Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 120: printed total AUD 15,482.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 116: printed total AUD 6,448.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 113: printed total AUD 17,438.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 121: printed total AUD 16,958.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 114: printed total AUD 6,732.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 115: printed total AUD 17,777.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 117: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 118: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 119: printed total AUD 6,217.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 126: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 125: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 127: printed total AUD 6,217.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 123: printed total AUD 17,777.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 128: printed total AUD 15,482.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 122: printed total AUD 6,732.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 124: printed total AUD 6,448.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 121: printed total AUD 17,438.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 129: printed total AUD 15,638.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 125: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 129: printed total AUD 15,638.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 123: printed total AUD 17,777.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 121: printed total AUD 17,438.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 124: printed total AUD 6,448.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 122: printed total AUD 6,732.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 126: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 127: printed total AUD 6,217.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 128: printed total AUD 15,482.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 128: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 127: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 125: printed total AUD 17,777.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 126: printed total AUD 6,448.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 130: printed total AUD 15,482.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 124: printed total AUD 6,732.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 123: printed total AUD 17,438.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 129: printed total AUD 6,217.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 131: printed total AUD 15,638.00 over its 4,400 kg gross-weight column) Invoiced: not held | |
| BNE to DXB | Air | Sep 2026 | not held | not held | Several rows on the card: AUD 4.15 per kg gross on PMC Emirates (EK), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 3.55 per kg gross on PMC Qatar (QR) to Thu 10 Sep, AUD 4.15 per kg gross on PMC Emirates (EK), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.55 per kg gross on PMC Qatar (QR) from Fri 11 Sep to Sun 27 Sep, AUD 4.59 per kg gross on PMC Emirates (EK), AUD 5.28 per kg gross on AKE Sri Lankan (UL), AUD 5.30 per kg gross on AKE Emirates (EK), AUD 4.05 per kg gross on PMC Sri Lankan (UL), AUD 3.70 per kg gross on PMC Qatar (QR), AUD 5.05 per kg gross on AKE Qatar (QR) from Mon 28 Sep | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 4.15 per kg gross on PMC Emirates (EK), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 3.55 per kg gross on PMC Qatar (QR) to Thu 10 Sep, AUD 4.15 per kg gross on PMC Emirates (EK), AUD 4.64 per kg gross on AKE Sri Lankan (UL), AUD 3.96 per kg gross on PMC Sri Lankan (UL), AUD 3.95 per kg gross on PMC Sri Lankan (UL), AUD 3.87 per kg gross on PMC Qatar (QR), AUD 4.29 per kg gross on AKE Qatar (QR), AUD 4.61 per kg gross on AKE Emirates (EK), AUD 3.55 per kg gross on PMC Qatar (QR) from Fri 11 Sep to Sun 27 Sep, AUD 4.59 per kg gross on PMC Emirates (EK), AUD 5.28 per kg gross on AKE Sri Lankan (UL), AUD 5.30 per kg gross on AKE Emirates (EK), AUD 4.05 per kg gross on PMC Sri Lankan (UL), AUD 3.70 per kg gross on PMC Qatar (QR), AUD 5.05 per kg gross on AKE Qatar (QR) from Mon 28 Sep (Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 128: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 127: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 125: printed total AUD 17,777.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 126: printed total AUD 6,448.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 130: printed total AUD 15,482.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 124: printed total AUD 6,732.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 123: printed total AUD 17,438.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 129: printed total AUD 6,217.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 131: printed total AUD 15,638.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 130: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 126: printed total AUD 6,732.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 125: printed total AUD 17,438.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 127: printed total AUD 17,777.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 132: printed total AUD 15,482.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 131: printed total AUD 6,217.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 129: printed total AUD 18,677.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 128: printed total AUD 6,448.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 133: printed total AUD 15,638.00 over its 4,400 kg gross-weight column; Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 10: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 12: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 1800.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 10: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 12: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 1800.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 11: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 11: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 670 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00)) Invoiced: not held | |
| BNE to DXB | Air | Oct 2026 | AUD 4.36 per kg gross | not held | Several rows on the card: AUD 4.53 per kg gross on PMC Emirates (EK), AUD 4.77 per kg gross on AKE Sri Lankan (UL), AUD 4.53 per kg gross on AKE Emirates (EK), AUD 4.05 per kg gross on PMC Sri Lankan (UL), AUD 3.70 per kg gross on PMC Qatar (QR), AUD 4.23 per kg gross on AKE Qatar (QR) to Fri 2 Oct, AUD 3.60 per kg gross on PMC Sri Lankan (UL), AUD 3.83 per kg gross on AKE Sri Lankan (UL), AUD 4.09 per kg gross on PMC Qatar (QR), AUD 4.53 per kg gross on AKE Emirates (EK), AUD 4.53 per kg gross on PMC Emirates (EK), AUD 4.23 per kg gross on AKE Qatar (QR) from Sat 3 Oct to Sun 4 Oct, AUD 4.02 per kg gross on PMC Qatar (QR), AUD 4.42 per kg gross on PMC Emirates (EK), AUD 3.65 per kg gross on PMC Sri Lankan (UL), AUD 4.12 per kg gross on AKE Qatar (QR), AUD 3.82 per kg gross on AKE Sri Lankan (UL), AUD 4.42 per kg gross on AKE Emirates (EK) from Mon 5 Oct to Thu 8 Oct, AUD 4.42 per kg gross on PMC Emirates (EK), AUD 4.12 per kg gross on AKE Qatar (QR), AUD 3.82 per kg gross on AKE Sri Lankan (UL), AUD 4.02 per kg gross on PMC Qatar (QR), AUD 4.42 per kg gross on AKE Emirates (EK), AUD 3.65 per kg gross on PMC Sri Lankan (UL) from Fri 9 Oct to Fri 9 Oct, AUD 3.82 per kg gross on AKE Sri Lankan (UL), AUD 4.42 per kg gross on PMC Emirates (EK), AUD 4.42 per kg gross on AKE Emirates (EK), AUD 3.65 per kg gross on PMC Sri Lankan (UL), AUD 4.02 per kg gross on PMC Qatar (QR), AUD 4.12 per kg gross on AKE Qatar (QR) from Sat 10 Oct | not held | 0 | Built: our component build over 1 quote line raised in the month: every cost line but the produce, AUD 8,340.69 over 1,915.2 kg gross Stated: not held Sheet: Several rows on the card: AUD 4.53 per kg gross on PMC Emirates (EK), AUD 4.77 per kg gross on AKE Sri Lankan (UL), AUD 4.53 per kg gross on AKE Emirates (EK), AUD 4.05 per kg gross on PMC Sri Lankan (UL), AUD 3.70 per kg gross on PMC Qatar (QR), AUD 4.23 per kg gross on AKE Qatar (QR) to Fri 2 Oct, AUD 3.60 per kg gross on PMC Sri Lankan (UL), AUD 3.83 per kg gross on AKE Sri Lankan (UL), AUD 4.09 per kg gross on PMC Qatar (QR), AUD 4.53 per kg gross on AKE Emirates (EK), AUD 4.53 per kg gross on PMC Emirates (EK), AUD 4.23 per kg gross on AKE Qatar (QR) from Sat 3 Oct to Sun 4 Oct, AUD 4.02 per kg gross on PMC Qatar (QR), AUD 4.42 per kg gross on PMC Emirates (EK), AUD 3.65 per kg gross on PMC Sri Lankan (UL), AUD 4.12 per kg gross on AKE Qatar (QR), AUD 3.82 per kg gross on AKE Sri Lankan (UL), AUD 4.42 per kg gross on AKE Emirates (EK) from Mon 5 Oct to Thu 8 Oct, AUD 4.42 per kg gross on PMC Emirates (EK), AUD 4.12 per kg gross on AKE Qatar (QR), AUD 3.82 per kg gross on AKE Sri Lankan (UL), AUD 4.02 per kg gross on PMC Qatar (QR), AUD 4.42 per kg gross on AKE Emirates (EK), AUD 3.65 per kg gross on PMC Sri Lankan (UL) from Fri 9 Oct to Fri 9 Oct, AUD 3.82 per kg gross on AKE Sri Lankan (UL), AUD 4.42 per kg gross on PMC Emirates (EK), AUD 4.42 per kg gross on AKE Emirates (EK), AUD 3.65 per kg gross on PMC Sri Lankan (UL), AUD 4.02 per kg gross on PMC Qatar (QR), AUD 4.12 per kg gross on AKE Qatar (QR) from Sat 10 Oct (Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 10: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 12: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 1800.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 10: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 12: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 1800.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 11: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 11: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 12: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 12: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 11: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 2,800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 10: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 10: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 11: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 14: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 2,800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 13: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 15: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 14: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 15: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 13: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 13: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 14: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 15: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 14: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 2,800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 13: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 15: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 17: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 15: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 15: computed from the sheet, its own charges (FREIGHT 3.75/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 17: computed from the sheet, its own charges (FREIGHT 3.15/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 16: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 2,800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 16: computed from the sheet, its own charges (FREIGHT 3.45/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 210.00, COO 50.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,915.2 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 24.00 (AUD 147.00)) Invoiced: not held | |
| BNE to HKG | Air | Jul 2026 | not held | not held | Several rows on the card: AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.88 per kg gross on AKE Singapore (SQ), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.62 per kg gross on PMC Singapore (SQ), AUD 1.57 per kg gross on PMC Cathay Pacific (CX) | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.88 per kg gross on AKE Singapore (SQ), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.62 per kg gross on PMC Singapore (SQ), AUD 1.57 per kg gross on PMC Cathay Pacific (CX) (Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 81: printed total AUD 6,600.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 84: printed total AUD 2,723.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 82: printed total AUD 2,650.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 78: printed total AUD 6,375.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 80: printed total AUD 2,505.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 79: printed total AUD 12,405.00 over its 9,000 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 85: printed total AUD 7,275.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 83: printed total AUD 7,050.00 over its 4,500 kg gross-weight column) Invoiced: not held | |
| BNE to HKG | Air | Aug 2026 | not held | not held | Several rows on the card: AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.88 per kg gross on AKE Singapore (SQ), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.62 per kg gross on PMC Singapore (SQ), AUD 1.57 per kg gross on PMC Cathay Pacific (CX) to Mon 17 Aug, AUD 1.48 per kg gross on PMC Singapore (SQ), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX) from Tue 18 Aug to Tue 25 Aug, AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.48 per kg gross on PMC Singapore (SQ), AUD 1.42 per kg gross on PMC Cathay Pacific (CX) from Tue 18 Aug to Tue 25 Aug, AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.48 per kg gross on PMC Singapore (SQ), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX) from Wed 26 Aug | not held | 1 | AUD 0.24 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.88 per kg gross on AKE Singapore (SQ), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.62 per kg gross on PMC Singapore (SQ), AUD 1.57 per kg gross on PMC Cathay Pacific (CX) to Mon 17 Aug, AUD 1.48 per kg gross on PMC Singapore (SQ), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX) from Tue 18 Aug to Tue 25 Aug, AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.48 per kg gross on PMC Singapore (SQ), AUD 1.42 per kg gross on PMC Cathay Pacific (CX) from Tue 18 Aug to Tue 25 Aug, AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.48 per kg gross on PMC Singapore (SQ), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX) from Wed 26 Aug (Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 81: printed total AUD 6,600.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 84: printed total AUD 2,723.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 82: printed total AUD 2,650.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 78: printed total AUD 6,375.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 80: printed total AUD 2,505.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 79: printed total AUD 12,405.00 over its 9,000 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 85: printed total AUD 7,275.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 83: printed total AUD 7,050.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 93: printed total AUD 6,298.04 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 86: printed total AUD 6,375.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 87: printed total AUD 12,405.00 over its 9,000 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 90: printed total AUD 2,650.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 89: printed total AUD 6,600.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 92: printed total AUD 2,823.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 91: printed total AUD 7,050.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 88: printed total AUD 2,505.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 92: printed total AUD 2,823.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 87: printed total AUD 12,405.00 over its 9,000 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 88: printed total AUD 2,505.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 91: printed total AUD 7,050.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 90: printed total AUD 2,650.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 89: printed total AUD 6,600.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 93: printed total AUD 6,298.04 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 86: printed total AUD 6,375.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 93: printed total AUD 7,050.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 92: printed total AUD 2,650.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 95: printed total AUD 6,298.04 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 88: printed total AUD 6,375.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 90: printed total AUD 2,505.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 94: printed total AUD 2,823.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 91: printed total AUD 6,600.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 89: printed total AUD 12,405.00 over its 9,000 kg gross-weight column) Invoiced: 4 trades left out because no shipment weight is held |
| BNE to HKG | Air | Sep 2026 | not held | not held | Several rows on the card: AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.48 per kg gross on PMC Singapore (SQ), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX) to Thu 10 Sep, AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.48 per kg gross on PMC Singapore (SQ) from Fri 11 Sep to Sun 27 Sep, AUD 2.37 per kg gross on AKE SQ (SQ), AUD 1.76 per kg gross on AKE Cathay (CX), AUD 1.49 per kg gross on PMC CODE, AUD 2.43 per kg gross on AKE Cathay (CX), AUD 1.66 per kg gross on AKE CODE, AUD 1.49 per kg gross on PMC Cathay (CX), AUD 1.93 per kg gross on PMC Cathay (CX), AUD 1.72 per kg gross on PMC SQ (SQ), AUD 1.83 per kg gross on PMC Cathay (CX), AUD 2.33 per kg gross on AKE Cathay (CX) from Mon 28 Sep | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.48 per kg gross on PMC Singapore (SQ), AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX) to Thu 10 Sep, AUD 1.42 per kg gross on PMC Cathay Pacific (CX), AUD 1.38 per kg gross on PMC Cathay Pacific (CX), AUD 1.95 per kg gross on AKE Singapore (SQ), AUD 1.47 per kg gross on PMC Cathay Pacific (CX), AUD 1.73 per kg gross on AKE Cathay Pacific (CX), AUD 1.57 per kg gross on PMC Cathay Pacific (CX), AUD 1.83 per kg gross on AKE Cathay Pacific (CX), AUD 1.48 per kg gross on PMC Singapore (SQ) from Fri 11 Sep to Sun 27 Sep, AUD 2.37 per kg gross on AKE SQ (SQ), AUD 1.76 per kg gross on AKE Cathay (CX), AUD 1.49 per kg gross on PMC CODE, AUD 2.43 per kg gross on AKE Cathay (CX), AUD 1.66 per kg gross on AKE CODE, AUD 1.49 per kg gross on PMC Cathay (CX), AUD 1.93 per kg gross on PMC Cathay (CX), AUD 1.72 per kg gross on PMC SQ (SQ), AUD 1.83 per kg gross on PMC Cathay (CX), AUD 2.33 per kg gross on AKE Cathay (CX) from Mon 28 Sep (Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 93: printed total AUD 7,050.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 92: printed total AUD 2,650.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 95: printed total AUD 6,298.04 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 88: printed total AUD 6,375.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 90: printed total AUD 2,505.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 94: printed total AUD 2,823.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 91: printed total AUD 6,600.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 89: printed total AUD 12,405.00 over its 9,000 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 90: printed total AUD 6,375.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 91: printed total AUD 12,405.00 over its 9,000 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 96: printed total AUD 2,823.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 93: printed total AUD 6,600.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 92: printed total AUD 2,505.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 95: printed total AUD 7,050.00 over its 4,500 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 94: printed total AUD 2,650.50 over its 1,450 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 97: printed total AUD 6,298.04 over its 4,256 kg gross-weight column; Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 17: computed from the sheet, its own charges (FREIGHT 1.30/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 14: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 13: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 16: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 13: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 14: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 16: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 17: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 2,100 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 15: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 15: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00)) Invoiced: not held | |
| BNE to HKG | Air | Oct 2026 | not held | not held | Several rows on the card: AUD 2.37 per kg gross on AKE SQ (SQ), AUD 1.76 per kg gross on AKE Cathay (CX), AUD 1.49 per kg gross on PMC CODE, AUD 2.43 per kg gross on AKE Cathay (CX), AUD 1.66 per kg gross on AKE CODE, AUD 1.49 per kg gross on PMC Cathay (CX), AUD 1.93 per kg gross on PMC Cathay (CX), AUD 1.72 per kg gross on PMC SQ (SQ), AUD 1.83 per kg gross on PMC Cathay (CX), AUD 2.33 per kg gross on AKE Cathay (CX) to Fri 2 Oct, AUD 1.49 per kg gross on PMC CODE, AUD 1.66 per kg gross on AKE CODE, AUD 1.83 per kg gross on PMC Cathay (CX), AUD 1.49 per kg gross on PMC Cathay (CX), AUD 2.43 per kg gross on AKE Cathay (CX), AUD 1.72 per kg gross on PMC SQ (SQ), AUD 2.33 per kg gross on AKE Cathay (CX), AUD 2.37 per kg gross on AKE SQ (SQ), AUD 1.76 per kg gross on AKE Cathay (CX), AUD 1.93 per kg gross on PMC Cathay (CX) from Sat 3 Oct to Sun 4 Oct, AUD 2.12 per kg gross on AKE SQ (SQ), AUD 1.71 per kg gross on AKE Cathay (CX), AUD 1.61 per kg gross on AKE Cathay (CX), AUD 2.03 per kg gross on AKE Cathay (CX), AUD 1.81 per kg gross on PMC Cathay (CX), AUD 1.62 per kg gross on PMC SQ (SQ), AUD 1.53 per kg gross on PMC Cathay (CX), AUD 2.13 per kg gross on AKE Cathay (CX), AUD 1.71 per kg gross on PMC Cathay (CX) from Mon 5 Oct to Thu 8 Oct, AUD 1.71 per kg gross on PMC Cathay (CX), AUD 1.81 per kg gross on PMC Cathay (CX), AUD 1.61 per kg gross on AKE Cathay (CX), AUD 1.53 per kg gross on PMC Cathay (CX), AUD 1.62 per kg gross on PMC SQ (SQ), AUD 2.12 per kg gross on AKE SQ (SQ), AUD 2.13 per kg gross on AKE Cathay (CX), AUD 1.71 per kg gross on AKE Cathay (CX), AUD 2.03 per kg gross on AKE Cathay (CX) from Fri 9 Oct to Fri 9 Oct, AUD 1.71 per kg gross on AKE Cathay (CX), AUD 1.81 per kg gross on PMC Cathay (CX), AUD 2.13 per kg gross on AKE Cathay (CX), AUD 1.61 per kg gross on AKE Cathay (CX), AUD 1.62 per kg gross on PMC SQ (SQ), AUD 1.53 per kg gross on PMC Cathay (CX), AUD 1.71 per kg gross on PMC Cathay (CX), AUD 2.03 per kg gross on AKE Cathay (CX), AUD 2.12 per kg gross on AKE SQ (SQ) from Sat 10 Oct | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 2.37 per kg gross on AKE SQ (SQ), AUD 1.76 per kg gross on AKE Cathay (CX), AUD 1.49 per kg gross on PMC CODE, AUD 2.43 per kg gross on AKE Cathay (CX), AUD 1.66 per kg gross on AKE CODE, AUD 1.49 per kg gross on PMC Cathay (CX), AUD 1.93 per kg gross on PMC Cathay (CX), AUD 1.72 per kg gross on PMC SQ (SQ), AUD 1.83 per kg gross on PMC Cathay (CX), AUD 2.33 per kg gross on AKE Cathay (CX) to Fri 2 Oct, AUD 1.49 per kg gross on PMC CODE, AUD 1.66 per kg gross on AKE CODE, AUD 1.83 per kg gross on PMC Cathay (CX), AUD 1.49 per kg gross on PMC Cathay (CX), AUD 2.43 per kg gross on AKE Cathay (CX), AUD 1.72 per kg gross on PMC SQ (SQ), AUD 2.33 per kg gross on AKE Cathay (CX), AUD 2.37 per kg gross on AKE SQ (SQ), AUD 1.76 per kg gross on AKE Cathay (CX), AUD 1.93 per kg gross on PMC Cathay (CX) from Sat 3 Oct to Sun 4 Oct, AUD 2.12 per kg gross on AKE SQ (SQ), AUD 1.71 per kg gross on AKE Cathay (CX), AUD 1.61 per kg gross on AKE Cathay (CX), AUD 2.03 per kg gross on AKE Cathay (CX), AUD 1.81 per kg gross on PMC Cathay (CX), AUD 1.62 per kg gross on PMC SQ (SQ), AUD 1.53 per kg gross on PMC Cathay (CX), AUD 2.13 per kg gross on AKE Cathay (CX), AUD 1.71 per kg gross on PMC Cathay (CX) from Mon 5 Oct to Thu 8 Oct, AUD 1.71 per kg gross on PMC Cathay (CX), AUD 1.81 per kg gross on PMC Cathay (CX), AUD 1.61 per kg gross on AKE Cathay (CX), AUD 1.53 per kg gross on PMC Cathay (CX), AUD 1.62 per kg gross on PMC SQ (SQ), AUD 2.12 per kg gross on AKE SQ (SQ), AUD 2.13 per kg gross on AKE Cathay (CX), AUD 1.71 per kg gross on AKE Cathay (CX), AUD 2.03 per kg gross on AKE Cathay (CX) from Fri 9 Oct to Fri 9 Oct, AUD 1.71 per kg gross on AKE Cathay (CX), AUD 1.81 per kg gross on PMC Cathay (CX), AUD 2.13 per kg gross on AKE Cathay (CX), AUD 1.61 per kg gross on AKE Cathay (CX), AUD 1.62 per kg gross on PMC SQ (SQ), AUD 1.53 per kg gross on PMC Cathay (CX), AUD 1.71 per kg gross on PMC Cathay (CX), AUD 2.03 per kg gross on AKE Cathay (CX), AUD 2.12 per kg gross on AKE SQ (SQ) from Sat 10 Oct (Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 17: computed from the sheet, its own charges (FREIGHT 1.30/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 14: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 13: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 16: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 13: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 14: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 16: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 17: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 2,100 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 15: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 15: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 13: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 13: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 15: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 14: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 16: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 17: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 2,100 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 15: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 17: computed from the sheet, its own charges (FREIGHT 1.30/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 14: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.16/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 16: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 20: computed from the sheet, its own charges (FREIGHT 1.30/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 17: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 16: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 18: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 19: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 20: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 2,100 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 16: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 19: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 17: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 18: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 18: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 19: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 16: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 17: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 20: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 2,100 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 20: computed from the sheet, its own charges (FREIGHT 1.30/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 16: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 19: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 17: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 18: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 19: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 21: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 21: computed from the sheet, its own charges (FREIGHT 1.25/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 18: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,400 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 22: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 2,100 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 18: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 20: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 20: computed from the sheet, its own charges (FREIGHT 1.15/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 22: computed from the sheet, its own charges (FREIGHT 1.30/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 19: computed from the sheet, its own charges (FREIGHT 1.10/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00)) Invoiced: not held | |
| BNE to NSA | Sea | Aug 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| BNE to NSA | Sea | Oct 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| BNE to SIN | Sea | Jul 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| BNE to SIN | Sea | Sep 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| BNE to SIN | Air | Jul 2026 | not held | not held | Several rows on the card: AUD 1.58 per kg gross on AKE Qantas (QF), AUD 1.46 per kg gross on PMC Singapore (SQ), AUD 1.79 per kg gross on AKE Singapore (SQ), AUD 1.35 per kg gross on PMC Qantas (QF) | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 1.58 per kg gross on AKE Qantas (QF), AUD 1.46 per kg gross on PMC Singapore (SQ), AUD 1.79 per kg gross on AKE Singapore (SQ), AUD 1.35 per kg gross on PMC Qantas (QF) (Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 111: printed total AUD 2,288.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 110: printed total AUD 4,365.00 over its 3,000 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 109: printed total AUD 2,501.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 112: printed total AUD 4,065.00 over its 3,000 kg gross-weight column) Invoiced: not held | |
| BNE to SIN | Air | Aug 2026 | not held | not held | Several rows on the card: AUD 1.58 per kg gross on AKE Qantas (QF), AUD 1.46 per kg gross on PMC Singapore (SQ), AUD 1.79 per kg gross on AKE Singapore (SQ), AUD 1.35 per kg gross on PMC Qantas (QF) to Mon 17 Aug, AUD 1.65 per kg gross on AKE Qantas (QF), AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.86 per kg gross on AKE Singapore (SQ) from Tue 18 Aug to Tue 25 Aug, AUD 1.86 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.65 per kg gross on AKE Qantas (QF) from Tue 18 Aug to Tue 25 Aug, AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.86 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.65 per kg gross on AKE Qantas (QF) from Wed 26 Aug | not held | 3 | AUD 1,701.39 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 1.58 per kg gross on AKE Qantas (QF), AUD 1.46 per kg gross on PMC Singapore (SQ), AUD 1.79 per kg gross on AKE Singapore (SQ), AUD 1.35 per kg gross on PMC Qantas (QF) to Mon 17 Aug, AUD 1.65 per kg gross on AKE Qantas (QF), AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.86 per kg gross on AKE Singapore (SQ) from Tue 18 Aug to Tue 25 Aug, AUD 1.86 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.65 per kg gross on AKE Qantas (QF) from Tue 18 Aug to Tue 25 Aug, AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.86 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.65 per kg gross on AKE Qantas (QF) from Wed 26 Aug (Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 111: printed total AUD 2,288.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 110: printed total AUD 4,365.00 over its 3,000 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 109: printed total AUD 2,501.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-07-22_Vision_card.xlsx of Wed 22 Jul, Q3 Rates row 112: printed total AUD 4,065.00 over its 3,000 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 119: printed total AUD 2,388.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 120: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 118: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 117: printed total AUD 2,601.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 117: printed total AUD 2,601.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 120: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 118: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 119: printed total AUD 2,388.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 120: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 119: printed total AUD 2,601.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 122: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 121: printed total AUD 2,388.00 over its 1,450 kg gross-weight column) Invoiced: 6 trades left out because no shipment weight is held |
| BNE to SIN | Air | Sep 2026 | not held | not held | Several rows on the card: AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.86 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.65 per kg gross on AKE Qantas (QF) to Thu 10 Sep, AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.86 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.65 per kg gross on AKE Qantas (QF) from Fri 11 Sep to Sun 27 Sep, AUD 2.18 per kg gross on AKE Qantas (QF), AUD 2.27 per kg gross on AKE SQ (SQ), AUD 1.68 per kg gross on PMC Qantas (QF), AUD 1.53 per kg gross on PMC SQ (SQ) from Mon 28 Sep | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.86 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.65 per kg gross on AKE Qantas (QF) to Thu 10 Sep, AUD 1.38 per kg gross on PMC Qantas (QF), AUD 1.86 per kg gross on AKE Singapore (SQ), AUD 1.38 per kg gross on PMC Singapore (SQ), AUD 1.65 per kg gross on AKE Qantas (QF) from Fri 11 Sep to Sun 27 Sep, AUD 2.18 per kg gross on AKE Qantas (QF), AUD 2.27 per kg gross on AKE SQ (SQ), AUD 1.68 per kg gross on PMC Qantas (QF), AUD 1.53 per kg gross on PMC SQ (SQ) from Mon 28 Sep (Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 120: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 119: printed total AUD 2,601.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 122: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 121: printed total AUD 2,388.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 124: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 121: printed total AUD 2,601.00 over its 1,400 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 122: printed total AUD 5,872.44 over its 4,256 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 123: printed total AUD 2,388.00 over its 1,450 kg gross-weight column; Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 26: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 27: computed from the sheet, its own charges (FREIGHT 1.20/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 26: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 27: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 3,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00)) Invoiced: not held | |
| BNE to SIN | Air | Oct 2026 | not held | not held | Several rows on the card: AUD 2.18 per kg gross on AKE Qantas (QF), AUD 2.27 per kg gross on AKE SQ (SQ), AUD 1.68 per kg gross on PMC Qantas (QF), AUD 1.53 per kg gross on PMC SQ (SQ) to Fri 2 Oct, AUD 1.68 per kg gross on PMC Qantas (QF), AUD 2.18 per kg gross on AKE Qantas (QF), AUD 1.53 per kg gross on PMC SQ (SQ), AUD 2.27 per kg gross on AKE SQ (SQ) from Sat 3 Oct to Sun 4 Oct, AUD 1.88 per kg gross on AKE Qantas (QF), AUD 1.56 per kg gross on PMC Qantas (QF), AUD 2.02 per kg gross on AKE SQ (SQ), AUD 1.47 per kg gross on PMC SQ (SQ) from Mon 5 Oct to Thu 8 Oct, AUD 2.02 per kg gross on AKE SQ (SQ), AUD 1.56 per kg gross on PMC Qantas (QF), AUD 1.47 per kg gross on PMC SQ (SQ), AUD 1.88 per kg gross on AKE Qantas (QF) from Fri 9 Oct to Fri 9 Oct, AUD 2.02 per kg gross on AKE SQ (SQ), AUD 1.88 per kg gross on AKE Qantas (QF), AUD 1.56 per kg gross on PMC Qantas (QF), AUD 1.47 per kg gross on PMC SQ (SQ) from Sat 10 Oct | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 2.18 per kg gross on AKE Qantas (QF), AUD 2.27 per kg gross on AKE SQ (SQ), AUD 1.68 per kg gross on PMC Qantas (QF), AUD 1.53 per kg gross on PMC SQ (SQ) to Fri 2 Oct, AUD 1.68 per kg gross on PMC Qantas (QF), AUD 2.18 per kg gross on AKE Qantas (QF), AUD 1.53 per kg gross on PMC SQ (SQ), AUD 2.27 per kg gross on AKE SQ (SQ) from Sat 3 Oct to Sun 4 Oct, AUD 1.88 per kg gross on AKE Qantas (QF), AUD 1.56 per kg gross on PMC Qantas (QF), AUD 2.02 per kg gross on AKE SQ (SQ), AUD 1.47 per kg gross on PMC SQ (SQ) from Mon 5 Oct to Thu 8 Oct, AUD 2.02 per kg gross on AKE SQ (SQ), AUD 1.56 per kg gross on PMC Qantas (QF), AUD 1.47 per kg gross on PMC SQ (SQ), AUD 1.88 per kg gross on AKE Qantas (QF) from Fri 9 Oct to Fri 9 Oct, AUD 2.02 per kg gross on AKE SQ (SQ), AUD 1.88 per kg gross on AKE Qantas (QF), AUD 1.56 per kg gross on PMC Qantas (QF), AUD 1.47 per kg gross on PMC SQ (SQ) from Sat 10 Oct (Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 26: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 27: computed from the sheet, its own charges (FREIGHT 1.20/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 26: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 27: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 3,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 26: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 26: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 27: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 3,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 27: computed from the sheet, its own charges (FREIGHT 1.20/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 29: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 29: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 30: computed from the sheet, its own charges (FREIGHT 1.20/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 30: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 30: computed from the sheet, its own charges (FREIGHT 1.20/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 29: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 30: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 29: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.26/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 32: computed from the sheet, its own charges (FREIGHT 1.20/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 31: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 31: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,700 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 32: computed from the sheet, its own charges (FREIGHT 1.00/kg, TERMINAL_FEES 0.11/kg, HANDLING 0.15/kg, SCREENING_KG 0.08/kg, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 24.00, DEPARTMENTAL TONNAGE AUD 6.00 (AUD 30.00)) Invoiced: not held | |
| PER to KUL | Air | Aug 2026 | not held | not held | Several rows on the card: AUD 2.20 per kg gross on PMC Malaysian (MH), AUD 2.72 per kg gross on AKE Malaysian (MH) | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 2.20 per kg gross on PMC Malaysian (MH), AUD 2.72 per kg gross on AKE Malaysian (MH) (Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 31: printed total AUD 6,604.00 over its 3,000 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 30: printed total AUD 2,176.00 over its 800 kg gross-weight column) Invoiced: not held | |
| PER to KUL | Air | Sep 2026 | not held | not held | Several rows on the card: AUD 2.20 per kg gross on PMC Malaysian (MH), AUD 2.72 per kg gross on AKE Malaysian (MH) to Tue 1 Sep, AUD 2.00 per kg gross on AKE Singapore Airlines (SQ), AUD 1.80 per kg gross on PMC Singapore Airlines (SQ) from Wed 2 Sep to Thu 10 Sep, AUD 1.65 per kg gross on PMC Malaysian (MH), AUD 1.80 per kg gross on AKE Malaysian (MH) from Wed 2 Sep to Thu 10 Sep, AUD 2.72 per kg gross on AKE Malaysian (MH), AUD 2.20 per kg gross on PMC Malaysian (MH) from Fri 11 Sep to Sun 27 Sep, AUD 2.18 per kg gross on PMC Malaysian (MH), AUD 2.90 per kg gross on AKE Malaysian (MH) from Mon 28 Sep | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 2.20 per kg gross on PMC Malaysian (MH), AUD 2.72 per kg gross on AKE Malaysian (MH) to Tue 1 Sep, AUD 2.00 per kg gross on AKE Singapore Airlines (SQ), AUD 1.80 per kg gross on PMC Singapore Airlines (SQ) from Wed 2 Sep to Thu 10 Sep, AUD 1.65 per kg gross on PMC Malaysian (MH), AUD 1.80 per kg gross on AKE Malaysian (MH) from Wed 2 Sep to Thu 10 Sep, AUD 2.72 per kg gross on AKE Malaysian (MH), AUD 2.20 per kg gross on PMC Malaysian (MH) from Fri 11 Sep to Sun 27 Sep, AUD 2.18 per kg gross on PMC Malaysian (MH), AUD 2.90 per kg gross on AKE Malaysian (MH) from Mon 28 Sep (Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 31: printed total AUD 6,604.00 over its 3,000 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 30: printed total AUD 2,176.00 over its 800 kg gross-weight column; Vision's sheet PER-KUL-SQ-Wed 2 Sep: Liam on WhatsApp, Liam James Q group, 2 Sep 2026 17:43 AEST of Wed 2 Sep, WhatsApp Liam James Q group row 2: computed from the sheet, its own charges (FREIGHT 2.00/kg; one USB logger) on 1,000 kg chargeable; the sheet prints no total; Vision's sheet PER-KUL-SQ-Wed 2 Sep: Liam on WhatsApp, Liam James Q group, 2 Sep 2026 17:43 AEST of Wed 2 Sep, WhatsApp Liam James Q group row 1: computed from the sheet, its own charges (FREIGHT 1.80/kg; one USB logger) on 2,000 kg chargeable; the sheet prints no total; Vision's sheet PER-KUL-MH-Wed 2 Sep: Liam on WhatsApp, Liam James Q group, 2 Sep 2026 17:46 AEST of Wed 2 Sep, WhatsApp Liam James Q group row 2: computed from the sheet, its own charges (FREIGHT 1.65/kg; one USB logger) on 2,500 kg chargeable; the sheet prints no total; Vision's sheet PER-KUL-MH-Wed 2 Sep: Liam on WhatsApp, Liam James Q group, 2 Sep 2026 17:46 AEST of Wed 2 Sep, WhatsApp Liam James Q group row 1: computed from the sheet, its own charges (FREIGHT 1.80/kg; one USB logger) on 800 kg chargeable; the sheet prints no total; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 30: printed total AUD 2,176.00 over its 800 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 31: printed total AUD 6,604.00 over its 3,000 kg gross-weight column; Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 49: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 0.00/kg, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 3,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 49: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 0.00/kg, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 800 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00)) Invoiced: not held | |
| PER to KUL | Air | Oct 2026 | AUD 2.39 per kg gross | AUD 1.80 per kg gross | AUD 2.14 per kg gross to Thu 1 Oct, AUD 1.81 per kg gross from Fri 2 Oct to Fri 2 Oct, AUD 2.14 per kg gross from Sat 3 Oct to Sun 4 Oct, AUD 2.22 per kg gross from Mon 5 Oct to Thu 8 Oct, AUD 2.22 per kg gross from Fri 9 Oct to Fri 9 Oct, AUD 2.22 per kg gross from Sat 10 Oct | AUD 3.05 per kg gross | 1 | AUD 1,180.20 | Built: our component build over 1 quote line raised in the month: every cost line but the produce, AUD 8,711.26 over 3,648 kg gross; 7 further lines left out because the cost is not whole or not all in AUD Stated: James McNamara, 9 Oct 2026: Liam Fraser told him Perth to Kuala Lumpur is AUD 1.80 a kg all in (the day Liam said it is not recorded) Sheet: AUD 2.14 per kg gross to Thu 1 Oct, AUD 1.81 per kg gross from Fri 2 Oct to Fri 2 Oct, AUD 2.14 per kg gross from Sat 3 Oct to Sun 4 Oct, AUD 2.22 per kg gross from Mon 5 Oct to Thu 8 Oct, AUD 2.22 per kg gross from Fri 9 Oct to Fri 9 Oct, AUD 2.22 per kg gross from Sat 10 Oct (Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 49: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 0.00/kg, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 49: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 0.00/kg, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet PER-KUL-AKE-Fri 2 Oct: Nathan on WhatsApp, C&A / Vision new group!, 2 Oct 2026 14:29 AEST of Fri 2 Oct, WhatsApp C&A / Vision new group! row 1: computed from the sheet, its own charges (FREIGHT 1.80/kg, COO 50.00; one USB logger) on 3,648 kg chargeable; the sheet prints no total; Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 49: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 0.00/kg, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 49: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 0.00/kg, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 52: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 500.00, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 52: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 500.00, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 52: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 500.00, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 52: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 500.00, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 60: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 500.00, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 60: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.12/kg, HANDLING 500.00, SCREENING_KG 200.00, DOCUMENT_FEE 275.00, RFP 40.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 3,648 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00)) Invoiced: Vision bill 00243182 (trade 1038335, Thu 8 Oct): AUD 2,923.20 ex GST over the waybill's 960 kg; 1 trade left out because no shipment weight is held |
| PER to SIN | Air | Aug 2026 | not held | not held | Several rows on the card: AUD 1.67 per kg gross on PMC Qantas (QF), AUD 2.56 per kg gross on AKE Qantas (QF) to Tue 25 Aug, AUD 1.67 per kg gross on PMC Qantas (QF), AUD 2.56 per kg gross on AKE Qantas (QF) from Tue 18 Aug to Tue 25 Aug, AUD 2.56 per kg gross on AKE Qantas (QF), AUD 1.67 per kg gross on PMC Qantas (QF) from Wed 26 Aug | not held | 0 | Built: not held Stated: not held Sheet: Several rows on the card: AUD 1.67 per kg gross on PMC Qantas (QF), AUD 2.56 per kg gross on AKE Qantas (QF) to Tue 25 Aug, AUD 1.67 per kg gross on PMC Qantas (QF), AUD 2.56 per kg gross on AKE Qantas (QF) from Tue 18 Aug to Tue 25 Aug, AUD 2.56 per kg gross on AKE Qantas (QF), AUD 1.67 per kg gross on PMC Qantas (QF) from Wed 26 Aug (Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 37: printed total AUD 5,004.00 over its 3,000 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card_msg1a011b549f7d666b.xlsx of Tue 18 Aug, Q3 Rates row 36: printed total AUD 1,794.00 over its 700 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 37: printed total AUD 5,004.00 over its 3,000 kg gross-weight column; Vision's sheet 2026-08-18_Vision_card.xlsx of Tue 18 Aug, Q3 Rates row 36: printed total AUD 1,794.00 over its 700 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 38: printed total AUD 1,794.00 over its 700 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 39: printed total AUD 5,004.00 over its 3,000 kg gross-weight column) Invoiced: not held | |
| PER to SIN | Air | Sep 2026 | AUD 1.88 per kg gross | not held | Several rows on the card: AUD 2.56 per kg gross on AKE Qantas (QF), AUD 1.67 per kg gross on PMC Qantas (QF) to Tue 1 Sep, AUD 1.80 per kg gross from Wed 2 Sep to Thu 10 Sep, AUD 1.70 per kg gross on PMC Singapore (SQ), AUD 1.80 per kg gross on AKE Qantas (QF), AUD 1.70 per kg gross on PMC Qantas (QF), AUD 1.80 per kg gross on AKE Singapore (SQ) from Fri 11 Sep to Sun 27 Sep, AUD 1.77 per kg gross on PMC SQ (SQ), AUD 1.77 per kg gross on PMC Qantas (QF), AUD 2.07 per kg gross on AKE Qantas (QF), AUD 2.07 per kg gross on AKE SQ (SQ) from Mon 28 Sep | AUD 1.91 per kg gross | 3 | AUD 289.50 | Built: our component build over 1 quote line raised in the month: every cost line but the produce, AUD 1,800.00 over 960 kg gross Stated: not held Sheet: Several rows on the card: AUD 2.56 per kg gross on AKE Qantas (QF), AUD 1.67 per kg gross on PMC Qantas (QF) to Tue 1 Sep, AUD 1.80 per kg gross from Wed 2 Sep to Thu 10 Sep, AUD 1.70 per kg gross on PMC Singapore (SQ), AUD 1.80 per kg gross on AKE Qantas (QF), AUD 1.70 per kg gross on PMC Qantas (QF), AUD 1.80 per kg gross on AKE Singapore (SQ) from Fri 11 Sep to Sun 27 Sep, AUD 1.77 per kg gross on PMC SQ (SQ), AUD 1.77 per kg gross on PMC Qantas (QF), AUD 2.07 per kg gross on AKE Qantas (QF), AUD 2.07 per kg gross on AKE SQ (SQ) from Mon 28 Sep (Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 38: printed total AUD 1,794.00 over its 700 kg gross-weight column; Vision's sheet 2026-08-26_Vision_card_msg1a03b2387cacf372.xlsx of Wed 26 Aug, Q3 Rates row 39: printed total AUD 5,004.00 over its 3,000 kg gross-weight column; Vision's sheet PER-SIN-QF-AKE-Wed 2 Sep: Liam on WhatsApp, Liam James Q group, 2 Sep 2026 18:53 AEST of Wed 2 Sep, WhatsApp Liam James Q group row 1: computed from the sheet, its own charges (FREIGHT 1.80/kg; one USB logger) on 960 kg chargeable; the sheet prints no total; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 39: printed total AUD 6,800.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 40: printed total AUD 1,800.00 over its 1,000 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 41: printed total AUD 6,800.00 over its 4,000 kg gross-weight column; Vision's sheet 2026-09-11_Vision_card_msg1a08f7d26e8cb882.xlsx of Fri 11 Sep, Q3 Rates row 38: printed total AUD 1,800.00 over its 1,000 kg gross-weight column; Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 52: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 51: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 51: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 52: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00)) Invoiced: Vision bill 00242942 (trade 1038332, Wed 30 Sep): AUD 1,815.00 ex GST over the waybill's 950 kg; 3 trades left out because no shipment weight is held |
| PER to SIN | Air | Oct 2026 | AUD 1.85 per kg gross | AUD 1.80 per kg gross | Several rows on the card: AUD 1.77 per kg gross on PMC SQ (SQ), AUD 1.77 per kg gross on PMC Qantas (QF), AUD 2.02 per kg gross on AKE Qantas (QF), AUD 2.02 per kg gross on AKE SQ (SQ) to Fri 2 Oct, AUD 1.77 per kg gross on PMC Qantas (QF), AUD 2.02 per kg gross on AKE SQ (SQ), AUD 2.02 per kg gross on AKE Qantas (QF), AUD 1.77 per kg gross on PMC SQ (SQ) from Sat 3 Oct to Sun 4 Oct, AUD 1.84 per kg gross on PMC Qantas (QF), AUD 1.84 per kg gross on PMC SQ (SQ), AUD 2.26 per kg gross on AKE Qantas (QF), AUD 2.26 per kg gross on AKE SQ (SQ) from Mon 5 Oct to Thu 8 Oct, AUD 1.76 per kg gross on AKE SQ (SQ), AUD 1.72 per kg gross on PMC SQ (SQ), AUD 1.84 per kg gross on PMC Qantas (QF), AUD 2.26 per kg gross on AKE Qantas (QF) from Fri 9 Oct to Fri 9 Oct, AUD 1.85 per kg gross on AKE Qantas (QF), AUD 1.72 per kg gross on PMC Qantas (QF), AUD 1.76 per kg gross on AKE SQ (SQ), AUD 1.72 per kg gross on PMC SQ (SQ) from Sat 10 Oct | AUD 1.91 per kg gross | 1 | AUD 406.00 | Built: our component build over 10 quote lines raised in the month: every cost line but the produce, AUD 21,664.12 over 11,731.2 kg gross Stated: James McNamara, 9 Oct 2026: Liam Fraser told him Perth to Singapore is AUD 1.80 a kg all in (the day Liam said it is not recorded) Sheet: Several rows on the card: AUD 1.77 per kg gross on PMC SQ (SQ), AUD 1.77 per kg gross on PMC Qantas (QF), AUD 2.02 per kg gross on AKE Qantas (QF), AUD 2.02 per kg gross on AKE SQ (SQ) to Fri 2 Oct, AUD 1.77 per kg gross on PMC Qantas (QF), AUD 2.02 per kg gross on AKE SQ (SQ), AUD 2.02 per kg gross on AKE Qantas (QF), AUD 1.77 per kg gross on PMC SQ (SQ) from Sat 3 Oct to Sun 4 Oct, AUD 1.84 per kg gross on PMC Qantas (QF), AUD 1.84 per kg gross on PMC SQ (SQ), AUD 2.26 per kg gross on AKE Qantas (QF), AUD 2.26 per kg gross on AKE SQ (SQ) from Mon 5 Oct to Thu 8 Oct, AUD 1.76 per kg gross on AKE SQ (SQ), AUD 1.72 per kg gross on PMC SQ (SQ), AUD 1.84 per kg gross on PMC Qantas (QF), AUD 2.26 per kg gross on AKE Qantas (QF) from Fri 9 Oct to Fri 9 Oct, AUD 1.85 per kg gross on AKE Qantas (QF), AUD 1.72 per kg gross on PMC Qantas (QF), AUD 1.76 per kg gross on AKE SQ (SQ), AUD 1.72 per kg gross on PMC SQ (SQ) from Sat 10 Oct (Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 52: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (PMC columns) row 51: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 51: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-09-28_Vision_rate_sheet_returned_by_Liam.xlsx of Mon 28 Sep, AIR (AKE columns) row 52: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 51: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 52: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (AKE columns) row 51: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-03_Vision_rate_sheet_msg1a10084c2ef1c46d.xlsx of Sat 3 Oct, AIR (PMC columns) row 52: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg, AO_INSPECTION_PER_HOUR 205.00; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 54: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 500.00, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (PMC columns) row 55: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 500.00, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 54: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 500.00, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-05_msg1a10adb1d0b3ec69_Vision_rate_sheet.xlsx of Mon 5 Oct, AIR (AKE columns) row 55: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 500.00, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 55: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 55: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (PMC columns) row 54: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 500.00, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-09_msg1a11fbd6171803dc_Vision_rate_sheet.xlsx of Fri 9 Oct, AIR (AKE columns) row 54: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 500.00, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 62: computed from the sheet, its own charges (FREIGHT 1.80/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 62: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (AKE columns) row 63: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 1,920 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms; Vision's sheet 2026-10-10_msg1a12462485e8356b_Vision_rate_sheet.xlsx of Sat 10 Oct, AIR (PMC columns) row 63: computed from the sheet, its own charges (FREIGHT 1.70/kg, TERMINAL_FEES 0.00/kg, HANDLING 0.00/kg, SCREENING_KG 0.00/kg, DOCUMENT_FEE 0.00, RFP 0.00, AO_INSPECTION 0.00, COO 0.00, TREATMENT_TOSSING_STEVE_CHARGES 0.00, RELABELLING 0.00, ELECTRONIC_PROCESSING 15.00, WINGS_ULD_BUILD 0.00, LOGGER_USB 50.00, WEEKEND_SURCHARGE 0.00/kg; one USB logger) on 4,000 kg chargeable; the sheet prints no total. The department's charges are on their own line, not in this all-in: DEPARTMENTAL PERMIT AUD 123.00, DEPARTMENTAL TONNAGE AUD 2.00 (AUD 125.00); worked out at each of 10 quote lines' own kilograms) Invoiced: Vision bill 00242291 + 00243082 (trade 1038326, Tue 6 Oct): AUD 5,820.00 ex GST over the waybill's 3,225 kg; Vision bill 00243180 (trade 1038334, Thu 8 Oct): AUD 4,021.00 ex GST over the waybill's 1,920 kg |
| SYD to LTK | Sea | Jul 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| SYD to LTK | Sea | Aug 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| SYD to NAN | Sea | Jul 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held | |
| SYD to NAN | Sea | Aug 2026 | not held | not held | not held | not held | 0 | Built: not held Stated: not held Sheet: not held Invoiced: not held |